Lagoon grading for manure storage & transfer system

Manufacturing Plant

The Project

A new 6,750 sq. ft. addition to an existing 74,500 sq. ft. manufacturing facility in Chippewa Falls, WI. The project included a recessed water test basin, paint booth, bridge crane, air conditioning, and relocation of the facility’s main electrical service. W.S. Darley, Manufacturing Plant,  Chippewa Falls, WI

The Challenge

AC/a faced the challenge of soils correction coupled with minimizing facility electrical outage, tight lot restrictions, and minimal interruptions to production throughout the project.

The Solution

The AC/a team developed full construction documents, specifications, and provided on-site construction coordination. Engineered a new 4,000 amp 277/480 volt 3 phase electrical service and provided back feeding for the current 1600 amp service. The electrical service outage to the facility was limited to less than eight hours.

Planning & Project Management

HVAC Design & Engineering

Electrical Design & Engineering

Plumbing Design & Engineering

Structural Engineering